Transportation News Weekly Project Bids Newsletter Site Updated January 29, 2010
|
Five CDOT Project Bids Were Opened January 28, 2010 STA 2873-156 Resurfacing on US 287 in Larimer County NH 0821-088 Major Surface Treatment on SH 82 in Garfield County MTCE R100-171 Stencil Pavement Markings on Various Highways in Jefferson, Douglas, and Arapahoe Counties ES5 1602-123 Intersection Relocation on US 160 in La Plata County IM 0253-210 Overlay and Installation of Tensioned Cable Barrier on I-25 in Larimer and Weld Counties Anticipated Bid Openings 2nd Deferral – Bids for project MTCE 0701-204 consisting of pile repair of a bridge abutment and traffic control on structure G-04-AE on westbound I-70 at milepost 61.649, Debeque cutoff road (45.50 Road) in Mesa County, must be received by 10 a.m. Thursday, February 11, 2010 (Fourth Reading). This project had previously been scheduled for bid reading on Thursday, January 28, 2010 (Sixth Reading). Deferral – Bids for project IM 0251-337 consisting of resurfacing including planing, paving, guardrail and bridge rail, striping, signing, erosion control, and minor deck repair on multiple structures on I-25 north of Trinidad from mileposts 14.1 to 23.2 in Las Animas County, must be received by 10 a.m. Thursday, February 4, 2010 (Sixth Reading). This project had previously been scheduled for bid reading on Thursday, January 28, 2010 (First Reading). Thursday, February 18, 2010, 10 a.m. (First Reading) – Project ES2 0504-060 consists of resurfacing including rotomilling and overlaying with two inches of hot mix asphalt on US 50B from mileposts 329.6 to 335.5, US 50C from mileposts 7.3 to 9.7 and overlaying four inches of hot mix asphalt on US 50B from mileposts 332 to 335.5; bridge deck repair at Chico Creek; bridge rail upgrade at the Arkansas River; widening at US 50B and Avondale Blvd. for a center left turn acceleration lane and an eastbound right turn deceleration lane; widening SH 233 at US 50C business route for a left turn bay; and other safety improvements such as guardrail, signs, safety edge installation, and minor widening along US 50B in Pueblo County. Completion: 100 work days. Resident Engineer: Karen Rowe, CDOT Region 2, Pueblo. This is an ARRA project. Thursday, February 18, 2010, 10 a.m. (Second Reading) – Project ES4 0061-080 consists of a hot mix asphalt overlay with heating and scarifying treatment on US 6 in Washington and Logan counties. Completion: 70 work days. Resident Engineer: Brett Locke, CDOT Region 4, Sterling. This is an ARRA project. Thursday, March 4, 2010, 10 a.m. (First Reading) – Project ES5 1602-125 consists of a 1.25 inch hot mix leveling course followed by a two inch hot mix asphalt finished mat including replacement of concrete curb and gutter, curb ramps, and sidewalk on US 160 from mileposts 201 to 215 through the Town of Del Norte in Rio Grande County. Completion: June 30, 2010. Resident Engineer: Don Sjaastad, CDOT Region 5, Alamosa. This is an ARRA project. Thursday, March 11, 2010, 10 a.m. (First Reading) – Project ES6 0852-103 consists of reconstruction of the US 85 and C-470 interchange including a flyover ramp from southbound US 85 to eastbound C-470 including a structure over Erickson Blvd.; reconstruction of an eastbound diamond on-ramp from US 85 to C-470; accel/decal lane construction from flyover/diamond on-ramps to eastbound off-ramp at Lucent Blvd.; reconstruction of the C-470 regional trail between US 85 and the High Line Canal trail crossing of C-470; and other miscellaneous improvements in Douglas County. A mandatory pre-bid conference will be held on February 8, 2010, from 9am to 12pm at the Region 6 Large Conference Room at 2000 S. Holly St. in Denver. Completion: 440 work days. Resident Engineer: Ron Buck, CDOT Region 6, Littleton. This is an ARRA project. CDOT Projects Awarded Bid December 30, 2009, awarded January 25, 2010, project ES6 C010-101 consists of replacement of the Alameda Ave. bridge over I-25 including construction of a new cofferdam and pump house, new outfall reinforced concrete box culvert, utility relocations, new paving, and reconstruction of a portion of I-25 north and south of Alameda in Denver County. Completion: 500 work days. Resident Engineer: Ron Buck, CDOT Region 6, Littleton. This is an American Recovery & Reinvestment Act (ARRA) project. Awarded to: Jalisco International Inc., Commerce City, CO. Amount: $23,723,233.20 DBE Goal – 13%; Committed – 50% Bid January 14, 2010, awarded January 25, 2010, project MTCE R200-168 consists of removal and installation of signs along two maintenance patrols, re-establishing mileposts on I-25 and SH 67, installation of static cantilever sign structure at exit 11 on I-25 and a static cantilever sign structure at US 50 bypass and I-25 in El Paso, Las Animas, Pueblo, and Teller counties. Completion: June 15, 2010. Traffic Engineer: Ajin Hu, CDOT Region 2, Pueblo. Awarded to: RMD Holdings Limited dba Nationwide Co., Chesterfield, MI. Amount: $652,162.56 Bid January 14, 2010, awarded January 26, 2010, project ES3 0702-297 consists of construction of four new roundabouts, concrete pavement, hot mix asphalt pavement, retaining walls, embankment, guardrail, culvert, and traffic control management on I-70 spur road at Beard Creek Road and Berry Creek Road in Eagle County. Completion: November 5, 2010. Resident Engineer: Martha Miller, CDOT Region 3, Eagle. This is an American Recovery and Reinvestment Act (ARRA) project. Awarded to: American Civil Constructors Inc., Littleton, CO. Amount: $6,422,888.00 DBE Goal – 11%; Committed – 11% Bid December 17, 2009, awarded January 28, 2010, project SHE 0402-076 consists of traffic signal placement, conduit, channelizing island, curb ramps, chip seal, pavement marking, and signs on US 40 from mileposts .58 to .72 in Moffat County. Completion: 40 work days. Traffic Engineer: Sean Yeates, CDOT Region 3, Grand Junction. Awarded to: Interface Communications Co., Longmont, CO. Amount: $269,718.04 DBE Goal – 11%; Committed – 13.64% Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By March 4, 2010, with Mountain Constructors Inc. of Platteville, CO, for project SHE 402A-008, sub account 17115, consisting of intersection improvements on SH 402 and Larimer County Rd. 11 in Larimer County. By February 19, 2010, with Tetra Tech Construction Services Inc. of Littleton, CO, for project MTCE SW00-620, sub account 16568, consisting of Fiscal Year 2008 ITS Capital Replacement Program maintenance in Costilla, Clear Creek, Eagle, Garfield, Summit, Mesa, and Rio Grande counties. Final Contract Payments Project BR 0361-052, sub account 11725, paid January 22, 2010, to Hamon Contractors Inc. of Denver, CO. Project NH 0504-056, sub account 16569, paid January 22, 2010, to Tricon 2 LLC of Castle Rock, CO. Project C 0702-275, sub account 16288, paid January 25, 2010, to American West Construction LLC of Denver, CO. Project NH 1603-025, sub account 16277, paid January 26, 2010, to A & S Construction Co. of Canon City, CO. Project PLH 150A-007, sub account 16706, paid January 26, 2010, to A & S Construction Co. of Canon City, CO. Project SHE 0702-267, sub account 15903, paid January 27, 2010, to Electrobraid Fence Inc. of Halifax, NS. Project STA 0831-106, sub account 16263, paid January 28, 2010, to New Design Construction Co. of Denver, CO. Project IM 0252-392, sub account 16172, paid January 29, 2010, to Premier Paving Inc. of Denver, CO.
|
No CDOT Project Bids Were Opened January 21, 2010 Anticipated Bid Openings Deferral – Bids for project ES5 1602-123, consisting of intersection relocation including full construction on new county roads, hot mix asphalt and overlay, minor widening for acceleration and deceleration lanes at the new intersection, guardrail, new fencing (deer and barbed wire), deer guards, cattle guards, wildlife detection system, concrete box culvert, and other drainage improvements on US 160 from milepost 92.975 to approximately milepost 94.842 in La Plata County, must be received by 10 a.m. Thursday, January 28, 2010 (Fifth Reading). This project had previously been scheduled for bid reading on Thursday, January 21, 2010 (First Reading). This is an American Recovery and Reinvestment Act (ARRA) project. Deferral – Bids for project MTCE 0701-204, consisting of pile repair of a bridge abutment and traffic control on structure G-04-AE on westbound I-70 at milepost 61.649, Debeque cutoff road (45.50 Road) in Mesa County, must be received by 10 a.m. Thursday, January 28, 2010 (Sixth Reading). This project had previously been scheduled for bid reading on Thursday, January 21, 2010 (Second Reading). Deferral – Bids for project IM 0253-210, consisting of adjusting and installing guardrail, rubbilization of concrete pavement, hot mix asphalt overlay, stone matrix asphalt (SMA), pipe edge drains, tensioned cable barrier, sign replacement and reset, rumble strips, pavement markings, and placement of construction traffic control devices on I-25 north of Larimer County Rd. 36 in Larimer and Weld counties, must be received by 10 a.m. Thursday, January 28, 2010 (Seventh Reading). This project had previously been scheduled for bid reading on Thursday, January 21, 2010 (Third Reading). Thursday, February 4, 2010, 10 a.m. (Fifth Reading) – Project MTCE R400-247 consists of epoxy pavement markings on various highways in CDOT’s Region 4 in Weld County. Completion: June 23, 2010. Traffic Engineer: Larry Haas, CDOT Region 4, Greeley. Thursday, February 11, 2010, 10 a.m. (First Reading) – Project CC R600-330 consists of a hot mix asphalt overlay and minor widening to accommodate a six foot bike lane in each direction, unclassified excavation (Special), topsoil, ABC (Cl. 6), hot mix asphalt, signing, striping, seeding, and mulching in Chatfield State Park on the perimeter road beginning 100 ft. south of the Stable Rd. entrance and extending .65 miles south in Jefferson County. Completion: May 24, 2010. Resident Engineer: Rick Erjavec, CDOT Region 6, Denver. Thursday, February 11, 2010, 10 a.m. (Second Reading) – Project ES1 2854-120 consists of construction of a 135 ft. span, 10 ft. wide pedestrian bridge over the Platte River including an associated bike path, curb and gutter, and sidewalk in Fairplay on US 285 in Park County. Completion: 33 work days. Resident Engineer: Steve Harelson, CDOT Region 1, Lakewood. This is an ARRA project. Thursday, February 11, 2010, 10 a.m. (Third Reading) – Project MTCE 0361-096 consists of replacement of existing signal conduit, curb ramp upgrades, and installation of a new signal cabinet on US 34 business and US 36 from Elkhorn Ave. to Moraine Ave. in Estes Park in Larimer County. Completion: 20 work days. Traffic Engineer: Larry Haas, CDOT Region 4, Greeley. CDOT Projects Awarded There are no project awards for this week. Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By February 18, 2010, with Rocky Mountain Enterprises Inc. of Grand Junction, CO, for project ITS 0503-069, sub account 17013, consisting of installation of two LED blank out signs and conduit on US 50 in Fremont County. Final Contract Payments Project STA 012A-042, sub account 15667, paid January 19, 2010, to APC Southern Construction Co. of Golden, CO. Project STA R100-143, sub account 16619, paid January 19, 2010, to Pioneer Sand Company Inc. of Colorado Springs, CO. Project ES6 0703-350, sub account 17246, paid January 20, 2010, to New Design Construction Co. of Denver, CO. This is an ARRA project. Project HB 131A-033, sub account 16189, paid January 20, 2010, to Connell Resources Inc. of Fort Collins, CO. Project SHE 0821-082, sub account 15873, paid January 20, 2010, to Tricon 2 LLC of Castle Rock, CO. Project SHE 0831-103, sub account 15544, paid January 21, 2010, to Scott Contracting Inc. of Henderson, CO.
|
Three CDOT Project Bids Were Opened January 14, 2010 ES3 0702-297 Roundabout Construction on I-70 in Eagle County MTCE R600-360 Bridge Repairs on I-76, US 6, & I-70 in Denver, Jefferson, Adams Counties MTCE R200-168 Sign Replacement on I-25, US 50, and SH 67 in El Paso, Las Animas, Pueblo, & Teller Counties Anticipated Bid Openings Thursday, January 28, 2010, 10 a.m. (Third Reading) – Project NH 0821-088 consists of a major surface treatment project including placement of 9.75 inch Portland Cement concrete pavement, curb and gutter, sidewalks, driveways, curb ramps, utility adjustments, fiber optics, pavement markings, and traffic control on SH 82/Grand Avenue from Hyland Park Dr. to 24th Street in Garfield County. Completion: June 8, 2010. Resident Engineer: Roland Wagner, CDOT Region 3, Glenwood Springs. Thursday, January 28, 2010, 10 a.m. (Fourth Reading) – Project MTCE R100-171 consists of removal and installation of stencil pavement markings on I-25, US 85, SH 83, and SH 86 in Jefferson, Douglas, and Arapahoe counties. Completion: June 25, 2010. Traffic Engineer: Clark Roberts, CDOT Region 1, Aurora. Thursday, February 4, 2010, 10 a.m. (First Reading) – Project ES1 0243-079 consists of resurfacing with hot mix asphalt on US 24 in Elbert County. A mandatory pre-bid conference will be held on January 26th from 10 a.m. to noon at 4201 E. Arkansas Ave. in the Auditorium on the 2nd floor in Denver. Completion: 70 work days. Resident Engineer: Travis Miller, CDOT Region 1, Limon. This is an ARRA project. Thursday, February 4, 2010, 10 a.m. (Second Reading) – Project IM 0703-352 consists of asphalt removal (planing), hot mix asphalt (Grade SX) (Pg. 58-28), stone matrix asphalt in the tunnel, removal of portions of present structures (Class I, II, III), waterproofing (membrane), removal of guardrail type 4, guardrail type 7 (Style CA), pavement marking, and construction traffic control on I-70 west of the Eisenhower Memorial Tunnel to Bakerville, mileposts 211 to 221.5, in Summit and Clear Creek counties. A mandatory pre-bid meeting will be held on January 26th from 10 a.m. to noon in the CDOT Headquarters Auditorium on the 2nd floor at 4201 E. Arkansas Ave. in Denver. Completion: 75 work days. Resident Engineer: Mark Vessely, CDOT Region 1, Silverthorne. Thursday, February 4, 2010, 10 a.m. (Third Reading) – Project MTCE R100-172 consists of installation of travel time signing on I-25 in El Paso and Douglas counties. A mandatory pre-bid conference will be held on January 20th at 9 a.m. at 425 Corporate Circle, Unit C, in Golden. Completion: June 25, 2010. Traffic Engineer: Saeed Sohbi, CDOT Region 1, Aurora. Thursday, February 4, 2010, 10 a.m. (Fourth Reading) – Project MP 0211-001 consists of installation of fiber optics, conduit, and pull boxes including replacement of various traffic signal cabinets on SH 16, SH 21, US 24, and SH 67 in Teller and El Paso counties. Completion: June 11, 2010. Traffic Engineer: Ajin Hu, CDOT Region 2, Pueblo. CDOT Projects Awarded Bid January 7, 2010, awarded January 13, 2010, project MTCE R400-221 consists of sign replacement including removal of existing signs and replacement with new on US 6, SH 52, and SH 71 in Morgan County. Completion: 85 work days. Traffic Engineer: Larry Haas, CDOT Region 4, Greeley. Awarded to: Rocky Mountain Enterprises Inc., Grand Junction, CO. Amount: $462,488.25 DBE Goal – 9%; Committed – 13.36% Bid January 7, 2010, awarded January 14, 2010, project ES4 0343-030 consists of a chip seal, pavement marking, and striping on US 34 from Brush to Akron in Morgan and Washington counties. Completion: 15 work days. Resident Engineer: Brett Locke, CDOT Region 4, Sterling. This is an ARRA project. Awarded to: Intermountain Slurry Seal Inc., Watsonville, CA. Amount: $1,453,413.00 DBE Goal – 6%; Committed – 6% Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By February 11, 2010, with Scott Contracting Inc. of Henderson, CO, for project ES3 0821-087, sub account 17304, consisting of widening ramps, reconstruction of concrete pavement, and traffic signal replacement on SH 82 in Garfield County. By February 18, 2010, with Rocky Mountain Enterprises Inc. of Grand Junction, CO, for project ITS 0503-069, sub account 17013, consisting of installation of two LED blank out signs on US 50 in Fremont County. Final Contract Payments Project C 0703-330, sub account 16410, paid January 8, 2010, to DKS Enterprises Inc. of Brighton, CO.
|
Two CDOT Project Bids Were Opened January 7, 2010 ES4 0343-030 Chip Seal on US 34 in Morgan and Washington Counties MTCE R400-221 Sign Replacement on US 6, SH 52, and SH 71 in Morgan County Anticipated Bid Openings Deferral – Bids for project MTCE R200-168 consisting of removal and installation of signs along two maintenance patrols, re-establishing mileposts on I-25 and SH 67, installation of static cantilever sign structure at exit 11 on I-25 and a static cantilever sign structure at US 50 bypass and I-25 in El Paso, Las Animas, Pueblo, and Teller counties must be received by 10 a.m. Thursday, January 14, 2010 (Third Reading). This project had previously been scheduled for bid reading on Thursday, January 7, 2010 (Third Reading). Thursday, January 28, 2010, 10 a.m. (First Reading) – Project IM 0251-337 consists of resurfacing including planing, paving, guardrail and bridge rail, striping, signing, erosion control, and minor deck repair on multiple structures on I-25 north of Trinidad from mileposts 14.1 to 23.2 in Las Animas County. Completion: 135 work days. Resident Engineer: Doug Lollar, CDOT Region 2, Pueblo. Thursday, January 28, 2010, 10 a.m. (Second Reading) – Project STA 2873-156 consists of resurfacing including hot mix asphalt aggregate base course and striping on US 287 south of Larimer County Rd. 17 and the US 287 Intersection to .31 miles south in Larimer County. Completion: 18 work days. Resident Engineer: Scott Ellis, CDOT Region 4, Loveland. CDOT Projects Awarded Bid December 17, 2009, awarded January 6, 2010, project SHE R600-337 consists of replacing signal poles and lights at the intersection of SH 95 (Sheridan Blvd.) and 56th Ave. (Ralston Rd.) and at the intersection of US 287 (Federal Blvd.) and SH 128 (W. 120th Ave.) in Broomfield, Denver, and Jefferson counties. Work includes installation of raised concrete median cover on SH 95 from 52nd to I-76. Completion: 90 work days. Resident Engineer: Ron Buck, CDOT Region 6, Littleton. Awarded to: K.E.C.I. Colorado Inc., Sedalia, CO. Amount: $664,318.00 DBE Goal – 6%; Committed – 10.98% Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By February 4, 2010, with Power Engineers Inc. of Lakewood, CO, for project EPSW00-541, sub account 16241, consisting of fiber optic cable installation on US 6 and I-25 in Denver, Jefferson, and Adams counties. By February 4, 2010, with Arrow Electric Services Inc. of Pueblo, CO, for project SHE 0451-009, sub account 16006, consisting of signal replacement and construction of a deceleration lane on SH 45 in Pueblo County. Final Contract Payments Project SHE 3921-008, sub account 16623, paid December 24, 2009, to Duran Excavating Inc. of Greeley, CO. Project STA 069A-023, sub account 16704, paid December 24, 2009, to Kiewit Western Co. of Littleton, CO. Project STA 3852-011, sub account 15819, paid December 24, 2009, to Intermountain Slurry Seal Inc. of Watsonville, CA. Project STA 4701-114, sub account 16968, paid January 5, 2010, to Brannan Sand and Gravel Co. LLC of Denver, CO.
|
One CDOT Project Bid Was Opened December 30, 2009 ES 6 C010-101 Bridge Replacement on Alameda Avenue over I-25 in Denver County Anticipated Bid Openings No anticipated bid openings for this week. CDOT Projects Awarded No project awards this week. Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By January 29, 2010, with Sturgeon Electric Co. Inc. of Henderson, CO, for project IM 070A-003, sub account 16701, consisting of lighting, signing, and communications for chain up stations on I-70 in Clear Creek, Summit, Jefferson, and Eagle counties.
|
No CDOT Project Bids Were Opened December 24, 2009 Anticipated Bid Openings Thursday, January 14, 2010, 10 a.m. (Second Reading) – Project MTCE R600-360 consists of bridge structure repairs including corbel, concrete girder and pier cap repair on E-17-GL on I-76 westbound and E-17-GM eastbound over the S. Platte River; install permanent support, install new attenuators, corbel, and concrete pier cap and column repair on F-16-FL on US 6 over SH 95; and column repair on E-17-GA I-70 westbound and E-17-GB I-70 eastbound over SH 35 in Denver, Jefferson, and Adams counties. Completion: May 15, 2010. Maintenance Engineer: Steve Pineiro, Region 6 Denver. Thursday, January 21, 2010, 10 a.m. (Third Reading) – Project IM 0253-210 consists of adjusting and installing guardrail, rubbilization of concrete pavement, hot mix asphalt overlay, stone matrix asphalt (SMA), pipe edge drains, tensioned cable barrier, sign replacement and reset, rumble strips, pavement markings, and placement of construction traffic control devices on I-25 north of Larimer County Rd. 36 in Larimer and Weld counties. Completion: 157 work days. Resident Engineer: Scott Ellis, CDOT Region 4, Loveland. CDOT Projects Awarded Bid December 3, 2009, awarded December 18, 2009, project IM 0703-310 consists of reconstruction of ramps on eastbound I-70 at 44th Avenue including a new acceleration lane that will require the removal of slope and ditch paving and replacement of soil nail wall, addition of right turn lane on westbound 44th from the new ramp location to Ward Rd, and two inch asphalt removal and two and a half inch stone matrix asphalt paving in Jefferson County. Completion: 291 work days. Resident Engineer: Ed Martinez, CDOT Region 6, Denver. Bid December 17, 2009, awarded December 24, 2009, project MTCE R600-363 consisting of installation of tensioned cable barrier on the north side of westbound I-70 between Kipling and Tabor streets in Jefferson County. Completion: 20 work days. Traffic Engineer: Ben Kiene, Region 6, Denver. Awarded to: Cruz Construction Inc., Colorado Springs, CO. Amount: $127,819.30 Notice of Final Settlement “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By January 28, 2010, with W.L. Contractors Inc. of Arvada, CO, for project ES4 257A-007, sub account 17190, consisting of intersection signalization and pedestrian crossing installation on SH 257 and Garden Drive in Weld County. This is an ARRA project. Final Contract Payments Project ES5 0242-045, sub account 16767, paid December 18, 2009, to Asphalt Paving Co. in Golden, CO. This is an American Recovery and Reinvestment Act (ARRA) project. Project ES5 1602-122, sub account 17183, paid December 18, 2009, to Elam Construction Inc. of Grand Junction, CO. This is an ARRA project. Project NH 0853-066, sub account 16050, paid December 18, 2009, to Coulson Excavating Co. of Loveland, CO. Project ES5 2852-016, sub account 17145, paid December 21, 2009, to Elam Construction Inc. of Grand Junction, CO. This is an ARRA project. Project SHE 0761-195, sub account 16495, paid December 21, 2009, to Highway Technologies Inc. of Denver, CO. Project BR R400-206, sub account 15809, paid December 22, 2009, to TLM Constructors Inc. of Greeley, CO. Project IM 0702-251, sub account 15052, paid December 22, 2009, to Columbine Hills Concrete Inc. of Silverthorne, CO.
|
Three CDOT Project Bids Were Opened December 17, 2009 SHE 0402-076 Traffic Signal Placement on US 40 in Moffat County SHE R600-337 Signal Light Replacement on SH 95 and US 287 in Denver and Jefferson Counties MTCE R600-363 Tensioned Cable Barrier Installation on I-70 in Jefferson County Anticipated Bid Openings 2nd Deferral – Bids for project ES 6 C010-101 consisting of replacement of the Alameda Ave. bridge over I-25 including construction of a new cofferdam and pump house, new outfall reinforced concrete box culvert, utility relocations, new paving, and reconstruction of a portion of I-25 north and south of Alameda in Denver County must be received by 10 a.m. Thursday, December 30, 2009 (First Reading). This project had previously been scheduled for bid reading on Thursday, December 17, 2009 (Third Reading). This is an American Recovery & Reinvestment Act (ARRA) project. Thursday, January 7, 2010, 10 a.m. (Third Reading) – Project MTCE R200-168 consists of removal and installation of signs along two maintenance patrols, re-establishing mileposts on I-25 and SH 67, installation of static cantilever sign structure at exit 11 on I-25 and a static cantilever sign structure at US 50 bypass and I-25 in El Paso, Las Animas, Pueblo, and Teller counties. Completion: June 15, 2010. Traffic Engineer: Ajin Hu, CDOT Region 2, Pueblo. Thursday, January 14, 2010, 10 a.m. (First Reading) – Project ES3 0702-297 consists of construction of four new roundabouts, concrete pavement, hot mix asphalt pavement, retaining walls, embankment, guardrail, culvert, and traffic control management on I-70 spur road at Beard Creek Road and Berry Creek Road in Eagle County. A mandatory pre-bid conference will be held on Tuesday, January 5th at 9:00 a.m. at Single Tree’s Community Center’s Large Conference Room, 1010 Berry Creek Rd, Edwards. Completion: November 5, 2010. Resident Engineer: Martha Miller, CDOT Region 3, Eagle. This is an American Recovery and Reinvestment Act (ARRA) project. Thursday, January 21, 2010, 10 a.m. (First Reading) – Project ES5 1602-123 consists of intersection relocation including full construction on new county roads, hot mix asphalt and overlay, minor widening for acceleration and deceleration lanes at the new intersection, guardrail, new fencing (deer and barbed wire), deer guards, cattle guards, wildlife detection system, concrete box culvert, and other drainage improvements on US 160 from milepost 92.975 to approximately milepost 94.842 in La Plata County. Completion: May 26, 2011. Project Engineer: Ed Archuleta, CDOT Region 5, Durango. This is an ARRA project. Thursday, January 21, 2010, 10 a.m. (Second Reading) – Project MTCE 0701-204 consists of pile repair of a bridge abutment and traffic control on structure G-04-AE on westbound I-70 at milepost 61.649, Debeque cutoff road (45.50 Road) in Mesa County. A mandatory pre-bid conference will be held on Tuesday, January 12th at 9 a.m. in the Grand Junction video conference room at 222 S. 6th St. Room 308 in Grand Junction and a mandatory site-inspection will be held the same day at 1 p.m. in the Debeque maintenance yard at 4615 US 6, Debeque. Completion: 20 work days. Traffic Engineer: Sean Yeates, CDOT Region 3, Grand Junction. CDOT Projects Awarded Bid December 3, 2009, awarded December 10, 2009, project C SW00-792 consists of replacement of seven variable message signs (VMS) in various locations statewide. Completion: May 29, 2010. Intelligent Transportation Systems (ITS) Engineer: Ali Imansepahi, CDOT ITS, Denver. Awarded to: Rocky Mountain Enterprises Inc., Grand Junction, CO. Amount: $1,155,693.00 Bid December 3, 2009, awarded December 10, 2009, project MTCE R300-157 consists of traffic signal bulb, pedestrian signal faces, and count down pedestrian head replacement with light emitting diodes (LEDs) indicators including replacement of overhead signs supplied by CDOT in CDOT’s Region 3 located in Delta, Eagle, Garfield, and Gunnison counties. Completion: 20 work days. Traffic Engineer: Pete Mertes, CDOT Region 3, Grand Junction. Awarded to: Apeiron Utility Construction, Clifton, CO. Amount: $197,070.00 Bid December 3, 2009, awarded December 11, 2009, project IM 0701-203 consists of surface treatment including two inch planing and stone matrix asphalt overlay, bridge approach slabs, bridge deck patching, guardrail upgrades, weather sensors, loops and piezos, drainage, pavement marking, and traffic control on I-70 from mileposts 108.5 to 119 with a no work zone from approximately mileposts 112 to 116.4 in Garfield County. Completion: 80 calendar days. Resident Engineer: Roland Wagner, CDOT Region 3, Glenwood Springs. Awarded to: Elam Construction Inc., Grand Junction, CO. Amount: $2,949,052.00 DBE Goal – 10%; Committed – 11.79% Notice of Final Settlement Date “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By January 15, 2010, with Scott Contracting Inc. of Henderson, CO, for project HB 092A-020, sub account 16188, consisting of minor realignment and reconstruction on SH 92 in Delta County. By January 15, 2010, with Arrow Electric Service Inc. of Pueblo, CO, for project NH 0502-062, sub account 17140, consisting of installation of a traffic signal on US 50 in Chaffee County. Final Contract Payments Project C 2706-033, sub account 13579, paid December 14, 2009, to Edward Kraemer and Sons Inc. of Plain, WI. Project STA R100-140, sub account 16521, paid December 16, 2009, to Yenter Companies Inc. of Arvada, CO. Project NH 0063-028, sub account 17099, paid December 18, 2009, to B & B Excavating of Eagle, CO.
|
No CDOT Project Bids Were Opened December 10, 2009 Anticipated Bid Openings Deferral – Bids for project MTCE R600-363 consisting of installation of tensioned cable barrier on the north side of westbound I-70 between Kipling and Tabor streets in Jefferson County must be received by 10 a.m. Thursday, December 17, 2009 (Fourth Reading). This project had previously been scheduled for bid reading on Thursday, December 10, 2009 (Second Reading). Thursday, January 7, 2010, 10 a.m. (First Reading) – Project ES4 0343-030 consists of a chip seal, pavement marking, and striping on US 34 from Brush to Akron in Morgan and Washington counties. Completion: 15 work days. Resident Engineer: Brett Locke, CDOT Region 4, Sterling. Thursday, January 7, 2010, 10 a.m. (Second Reading) – Project MTCE R400-221 consists of sign replacement including removal of existing signs and replacement with new on US 6, SH 52, and SH 71 in Morgan County. Completion: 85 work days. Traffic Engineer: Larry Haas, CDOT Region 4, Greeley. CDOT Projects Awarded Bid November 19, 2009, awarded December 9, 2009, project BR R600-353 consists of bridge repair on Quebec St. over Sand Creek, bridge expansion joint replacement on I-70 over I-25, and culvert repair on 6th Avenue at Lakewood Gulch in Jefferson and Denver counties. Completion: 95 work days. Resident Engineer: John Schwab, CDOT Region 6, Denver. Awarded to: Hamon Contractors Inc., Denver, CO. Amount: $1,084,000.00 DBE Goal – 11%; Committed – 21.23% Notice of Final Settlement Date “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By January 14, 2010, with Oldcastle SW Group Inc. dba United Companies of Mesa County of Grand Junction, CO, for project ES3 0701-197, sub account 17243, consisting of lengthening the eastbound ramp, resurfacing, and rock fall fence installation on I-70 in Mesa County. This is an American Recovery and Reinvestment Act (ARRA) project. By January 14, 2010, with Lafarge North America Inc. dba Lafarge West Inc. of Longmont, CO, for project IM 0702-285, sub account 16891, consisting of resurfacing on I-70 in Eagle County. By January 15, 2010, with Alert Traffic Control Inc. of Bayfield, CO, for project ITS 1602-121, sub account 17012, consisting of installation of LED in-pavement striping lighting system, and two blank out signs on US 160 in Mineral County. By January 29, 2010, with Rocky Mountain Enterprises Inc. of Grand Junction, CO, for project MTCE R300-152, sub account 16746, consisting of sign replacement on I-70 in CDOT’s Region 3. Final Contract Payments Project STA 1251-006, sub account 16494, paid December 2, 2009, to Oldcastle SW Group Inc. dba United Companies of Mesa County of Grand Junction, CO. Project ES5 062A-013, sub account 16870, paid December 3, 2009, to APC Southern Construction Co. of Golden, CO. This is an ARRA project. Project STA R400-147, sub account 14373, paid December 7, 2009, to Zak Dirt Inc. of Longmont, CO. Project IM R600-320, sub account 16806, paid December 9, 2009, to Technology Constructors Inc. of Arvada, CO.
|
Four CDOT Project Bids Were Opened December 3, 2009 IM 0703-310 Reconstruction of Ramps on I-70 at 44th Avenue in Jefferson County IM 0701-203 Surface Treatment on I-70 in Garfield County C SW00-792 Replacement of Seven Variable Message Signs in Jefferson County MTCE R300-157 Traffic Signal Bulb, Pedestrian Signal Faces, and Pedestrian Head Replacement in Delta, Eagle, Gargield, and Gunnison Counties. Anticipated Bid Openings Deferral – Bids for project ES 6 C010-101 consisting of replacement of the Alameda Ave. bridge over I-25 including construction of a new cofferdam and pump house, new outfall reinforced concrete box culvert, utility relocations, new paving, and reconstruction of a portion of I-25 north and south of Alameda in Denver County must be received by 10 a.m. Thursday, December 17, 2009 (Third Reading). This project had previously been scheduled for bid reading on Thursday, December 10, 2009 (First Reading). This is an American Recovery & Reinvestment Act (ARRA) project. Thursday, December 17, 2009, 10 a.m. (Second Reading) – Project SHE R600-337 consists of replacing signal poles and lights at the intersection of SH 95 (Sheridan Blvd.) and 56th Ave. (Ralston Rd.) and at the intersection of US 287 (Federal Blvd.) and SH 128 (W. 120th Ave.) in Broomfield, Denver, and Jefferson counties. Work includes installation of raised concrete median cover on SH 95 from 52nd to I-76. Completion: 90 work days. Resident Engineer: Ron Buck, CDOT Region 6, Littleton. CDOT Projects Awarded No projects were awarded this week. Notice of Final Settlement Date “Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Colorado Department of Transportation, at 4201 E. Arkansas Ave., Denver, Colorado, 80222, on or before 5 p.m. of the final settlement date listed.” By December 24, 2009, with Skanska USA Civil West of Cortez, CO, for project NH 5501-013, sub account 15666, consisting of construction of two new bridges on US 550 in La Plata County. By December 31, 2009, with W.L. Contractors Inc. of Arvada, CO, for project ES4 060A-013, sub account 17100, consisting of interchange signalization at SH 60 and I-25 in Weld County. This is an ARRA project. By December 31, 2009, with Lawson Construction Co. of Littleton, CO, for project NH 1602-112, sub account 15504, consisting of concrete pavement on US 160 in La Plata County. By January 14, 2010, with Oldcastle SW Group Inc. dba United Companies of Mesa County in Grand Junction, CO, for project ES4 0361-089, sub account 16909, consisting of a chip seal at various locations in Boulder and Larimer counties. This is an ARRA project. By January 14, 2010, with Connell Resources Inc. of Fort Collins, CO, for project SHE 3921-009, sub account 17016, consisting of a turn lane addition and paving on SH 392 and County Road 9 in Larimer County. Final Contract Payments Project ES5 1603-027, sub account 17144, paid November 23, 2009, to Elam Construction Inc. of Grand Junction, CO. Project NH 0503-064, sub account 15568, paid December 1, 2009, to A & S Construction Co. of Canon City, CO.
|
|
||||||||||